Under Magnitude
In January 2017, the latest work from art/architecture studio Marc Fornes/TheVeryMany was unveiled in Orlando’s Orange County Convention Center.
Under Magnitude is a two-storey, permanent structure suspended in the atrium of the Center, creating a three-dimensional intervention in the vast space.
The idea behind the structure is that it ‘has edges yet is edgeless’, and is an example of the studio’s ongoing development of ‘new minimalist’ digital assemblies – unique constructs that unify skin, structure and spatial experience into a single system.
The intention is that each person who passes beneath the structure forges a different kind of personal connection with its forms, which are borrowed from the natural world but contorted into new and alien constructs.
Under Magnitude is the sum of many sub-elements: a network of branches unified by a single smooth and continuous white surface. The intricate curvilinear shape forms a unified system of both 'columns' and 'beams,' aggregating to create a three-dimensional subspace. The open, tubular branches come together within a Y-shaped plan and reach upwards to form a shape that is both like a vault and a suction cup: a ‘shell from shells’.
The material thickness of Under Magnitude is just a millimetre, thinner than a credit card, yet the structure is strong enough to walk on. This strength is achieved by 'intensive curvature'; the maximisation of double curvature across the form which creates the curly, tubular branching characteristics of the structure.
The studio is building on and challenge the work of Frei Otto and his notion of 'extensive curvature', which determined that a bubble, when blown up to the size of a room, has better structural performance than a box.
Images and content courtesy of TheVeryMany.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























